Guangdong Shunjie Fire-fighting Electrical Engineering Co., Ltd.Welcome!

GD Shunjie. Fire Engineering CO., Ltd

Guangdong Shunjie Fire-fighting Electrical Engineering Co., Ltd.

24-hour contact number

137-1210-5616
0769-81126119

contact us

Contact: Mr. Cheng

phone:13712105616

Landline:0769-81126119

Your current location is: 首页>>Public announcement

Declaring construction project fire protection completion acceptance

release time:2021-03-23 10:25:04  Views: 469

Declaring construction project fire protection completion acceptance

Details on the official website of the Housing and Urban-rural Development Bureauhttp://zjj.dg.gov.cn/

1. Government service

20200302024636193.png

 2、

20200302024652712.png

在业务名称里面输入“消防”点击查询即可出现相关设计需要的相关资料

20200302024718589.png

1. Information required by the construction unit


1. Two copies of the business license of the construction unit;


2. Two copies of the ID card of the legal person of the construction unit;


3. Two copies of the ID card of the authorized agent;


4. One copy of the fire protection design review opinions;


5. The original version of the lease contract and the agreement for decoration on the official website of the Bureau of Housing and Urban-rural Development (with the seal of the lessor and the user). (The guide on the official website of the Bureau of Housing and Urban-rural Development can be downloaded)


2. Information required by the design unit


1. Two copies of the unit's business license with official seal;


2. One copy of the unit’s legal person’s ID card with official seal;


3. Two copies of the photocopy of the qualification certificate with official seal;


4. A copy of the designer’s qualification certificate and ID card with official seal in one copy;


5. The designer's information registration form (detailed attachment 1)


3. Information required by the construction unit


2. Two copies of the unit's business license with official seal;


2. One copy of the unit’s legal person’s ID card with official seal;


3. Two copies of the photocopy of the qualification certificate with official seal;


4. A copy of the construction management personnel qualification certificate and ID card with official seal in one copy;


5. Construction management personnel information registration form (detailed in Annex 1);


6. The design blueprint that has passed the plan review is stamped with the completion seal in 2 copies;


7. One copy of the fireproof performance test report and qualification certificate of decoration materials during the construction process;


8. One copy of inspection report for fire protection facilities.

annex1:

20200302030251520.png

contact us

Contact: Mr. Cheng

phone:13712105616

Landline:0769-81126119

Guangdong Shunjie Fire-fighting Electrical Engineering Co., Ltd.

Scan WeChat to follow us

all rights reserved © Guangdong Shunjie Fire-fighting Electrical Engineering Co., Ltd. Sitemap XML Technical Support: 一箭天

返回顶部