Approval process

release time:2021-03-23 10:30:23  Views: 486

According to the new "Fire Protection Law", the responsibilities of the fire department of public security organs are assigned to the public security organs. There are currently four administrative licensing items for the fire protection organs of the public security organs: construction project fire protection design review, construction project fire protection acceptance, public gathering places in use, and fire safety before business Inspection and acceptance by the full-time fire brigade. At the same time, the new "Fire Protection Law" reforms the fire protection supervision and management of construction projects. The fire protection agencies of the public security organs only conduct fire protection design reviews and fire protection inspections for large-scale crowded places and other special construction projects specified by the public security department of the State Council. Large-scale crowded places and other construction projects other than special construction projects implement a record-and-check system. The specific handling guidelines are as follows:

1. Fire protection design review for large crowded places and other special construction projects specified by the public security department of the State Council

(1) Scope of review:

For crowded places and special construction projects with one of the following circumstances, the construction unit shall submit the fire protection design documents to the fire protection agency of the public security organ for review:

(1) Sports venues, halls, public exhibition halls, and museum exhibition halls with a total construction area of more than 20,000 square meters;

(2) Civil airport terminal buildings, passenger terminal waiting rooms, and passenger terminal waiting rooms with a total construction area of more than 15,000 square meters;

(3) Hotels, restaurants, shopping malls and markets with a total construction area of more than 10,000 square meters;

(4) Cinemas and theaters with a total construction area of more than 2500 square meters, reading rooms of public libraries, commercial indoor fitness and leisure venues, outpatient buildings of hospitals, teaching buildings of universities, libraries, canteens, production and processing of labor-intensive enterprises Workshops, temples, churches;

(5) Children’s rooms for nurseries and kindergartens with a total construction area of more than 1,000 square meters, children’s play halls and other indoor children’s activity places, nursing homes, welfare homes, wards of hospitals and nursing homes, teaching buildings, libraries, and canteens of primary and secondary schools , The dormitory of the school, the dormitory of the employees of labor-intensive enterprises;

    (6) Song and dance halls, video halls, screening halls, karaoke halls, nightclubs, amusement halls, saunas, Internet cafes, bars, restaurants, tea houses, and coffee shops with entertainment functions with a total construction area of more than 500 square meters.

(7) Construction projects with densely populated places listed in Articles (1) to (6);

(8) Office buildings of state agencies, power dispatch buildings, telecommunications buildings, post buildings, disaster prevention command and dispatch buildings, radio and television buildings, and archives buildings;

(9) Other public buildings with a single building area of more than 40,000 square meters or a building height of more than 50 meters other than those specified in paragraphs 1 and 2 of this article;

(10) Urban rail transit, tunnel projects, large-scale power generation, transformation and distribution projects;

(11) Factories, warehouses and special stations and wharves for the production, storage, loading and unloading of inflammable and explosive dangerous goods, filling stations, supply stations, and pressure regulating stations for inflammable and explosive gases and liquids.

(2) Audit basis: "Fire Protection Law of the People's Republic of China", "Regulations on Fire Protection Supervision and Administration of Construction Projects" and other fire protection regulations; national engineering construction fire protection technical standards.

(3) Application materials:

1. Application form for fire protection design review of construction projects;

2. Legal identity documents such as the industrial and commercial business license of the construction unit (the photocopy is affixed with the company's seal);

3. Proof of construction project planning permission for new construction and expansion projects;

4. Qualification certificate of the design unit (copy with the unit's seal);

5. Fire protection design documents.

(4) Expert review: In one of the following circumstances, the construction unit shall provide technical solutions and instructions for special fire protection design, or the Chinese text of international standards, overseas fire protection technical standards adopted in the design, and other application examples of fire protection design , Product description and other technical information:

1. There is no provision in the national engineering construction fire protection technical standards;

2. The new technologies, new processes, and new materials to be adopted in the fire protection design documents may affect the fire safety of construction projects and do not meet the requirements of national standards;

3. It is planned to adopt international standards or overseas fire protection technical standards.

(5) Review period: complete the review and issue a written review opinion within 20 days from the date of acceptance. However, if an expert review needs to be organized in accordance with the law, the expert review time will not be included in the review time.

(6) Charge basis and standard: No charge.

2. Fire inspection and acceptance of large-scale crowded places and other special construction projects specified by the Public Security Department

(1) Scope of acceptance: the scope of fire protection acceptance is the same as the scope of fire protection design review. After the completion of a construction project that is subject to fire protection design review by the fire protection agency of the public security organ in accordance with the law, the construction unit shall apply to the fire protection agency of the public security organ that issued the fire protection design review opinion for fire protection acceptance.

(2) Acceptance basis: "Fire Protection Law of the People's Republic of China", "Regulations on Fire Protection Supervision and Administration of Construction Projects" and other fire protection regulations; "Construction Project Fire Protection Acceptance Assessment Rules" (GA836-2009), and national engineering construction fire protection technical standards.

(3) Application materials:

1. Application form for fire protection acceptance of construction project;

2. Project completion acceptance report;

3. The quality certificate of fire protection products (the copy is stamped with the unit's seal);

4. Documents that prove that the building components, building materials, and interior decoration materials with fireproof performance requirements meet the national or industry standards, and the factory certificate (the copy is affixed with the seal of the unit);

5. Qualification certificate for fire-fighting facilities and electrical fire-proof technology inspection;

6. The legal identity certificate and qualification level certificate of the construction, project supervision, and inspection unit (the photocopy is affixed with the unit's seal);

7. Other materials required by law.

(4) Acceptance period: within 20 days from the date of acceptance of the application for fire protection acceptance, fire inspection and acceptance shall be organized, and fire inspection and acceptance opinions shall be issued.

(5) Charge basis and standard: no charge.

3. Filing of fire protection design for construction projects other than large crowded places and other special construction projects specified by the public security department of the State Council

(1) Scope of filing: Except for the large-scale crowded places and other special construction projects specified by the public security department of the State Council, construction projects that require fire protection design in accordance with the national engineering construction fire protection technical standards, the construction unit shall start from the date of obtaining the construction permit. Within days, submit the fire protection design documents to the fire protection organization of the public security organ for the record of fire protection design, and the fire protection organization of the public security organ shall conduct random inspections in accordance with the law.

(2) Basis for filing: "Fire Protection Law of the People's Republic of China"; "Regulations on Fire Supervision and Administration of Construction Projects"

(3) Filing method: You can log in to the "Fire Service Hall" (www.gx119.gov.cn) or fill in the "Construction Project" through the record acceptance system in the "Fire Service Hall" of Guangxi Fire Network (www.gx119.net) Fire Design Filing Form" for online filing of fire design, print out the "Construction Engineering Fire Design Filing Acceptance Voucher" and take the voucher to the local government affairs center with a special seal for the filing voucher; you can also submit a paper filing form to the public security agency The service window of the fire protection organization shall be handled by the fire protection organization accepting personnel of the public security organ to enter the fire protection design record acceptance system. If the declared project is not selected randomly, it means that the fire protection design record of the construction project has been completed; if the declared project is selected randomly, the construction unit that is randomly checked shall report to the The fire department of the public security organ provides the following materials:

1. Legal identity documents such as the industrial and commercial business license of the construction unit (the photocopy is affixed with the unit's seal);

2. Proof of construction project planning permission for new construction and expansion projects;

3. Qualification certificate of the design unit (the copy is stamped with the unit's seal);

4. Fire protection design documents.

The fire protection agency of the public security organ shall complete the drawing inspection in accordance with the mandatory requirements of the fire protection regulations and the national engineering construction fire protection technical standards within 30 days after receiving the fire protection design filing materials, and the inspection results shall be announced in the fire protection filing acceptance system. You can check in the "Announcement Information" of the "Fire Service Hall" (www.gx119.gov.cn) with the record number and verification code for the record. If the inspection result is unsatisfactory, the fire protection agency of the public security organ shall, within five days according to law, issue a "Notice of Violation of Fire Protection Design for Construction Projects" and notify the construction unit in writing to make corrections. If construction has already started, the construction shall be stopped; after the construction unit receives the notification, it shall Stop the construction and send the fire protection organization to the public security agency for review after the organization of the fire protection design is revised; after the review, if the fire protection design meets the mandatory requirements of the national engineering construction fire protection technical standards, the fire protection agency of the public security agency issues a "Construction Project Fire Protection Design Review Opinion" to inform you that the fire protection design meets the compulsory requirements of the national engineering construction fire protection technical standards. The construction unit resumed construction. Those who fail to pass the random inspection according to law and do not stop the construction will be punished by law according to law.

Except for large-scale crowded places and other special construction projects specified by the public security department of the State Council, that is, outside the scope of fire protection design review in this guide, construction projects that require fire protection design in accordance with the national engineering construction fire protection technical standards shall report the fire protection design documents in accordance with the law. The fire department of the public security organ shall file for the record and accept random inspections by the fire department of the public security organ.

(4) Charge basis and standard: no charge.

4. The completion inspection and acceptance of construction projects other than the large-scale crowded places and other special construction projects stipulated by the public security department of the State Council

1. Scope of filing: Except for large-scale crowded places and other special construction projects specified by the public security department of the State Council, for construction projects that require fire protection design in accordance with the national engineering construction fire protection technical standards, the construction unit shall pass the acceptance check after completion Completion filing shall be submitted to the fire protection agency of the public security organ within days.

2. Basis for filing: "Fire Protection Law of the People's Republic of China"; "Regulations on Fire Supervision and Administration of Construction Projects"

3. Filing method: You can log in to the "Fire Service Hall" (www.gx119.gov.cn) or fill in the "Construction Project Completion" system in the "Fire Service Hall" of Guangxi Fire Network (www.gx119.net) Acceptance Fire Recording Form" for online record of fire protection completion acceptance, print out the "Construction Project Completion Acceptance Fire Recording Acceptance Certificate" and take the certificate to the local government affairs center with the special stamp of the record certificate; you can also submit a paper record form to The service window of the fire protection organization of the public security organ shall be handled by the fire protection organization of the public security organ to enter the acceptance system for the acceptance of fire protection completion. If the declared project is not selected randomly, it means that the acceptance and fire protection record of the construction project has been completed; if the declared project is randomly selected, the construction unit that is selected for random inspection shall report to you within 5 days from the date of receipt of the filing acceptance certificate The fire department of the public security organ provides the following materials:

(1) Project completion acceptance report;

(2) The quality certificate of fire protection products (the copy is affixed with the seal of the unit);

(3) Building components, building materials, and interior decoration materials with fireproof performance requirements to prove that they conform to national standards or industry standards, and the factory certificate (the copy is stamped with the unit's seal);

(4) Qualification certificate of fire-fighting facilities and electrical fire-proof technology inspection;

(5) The legal identity certificate and qualification level certificate of the construction, project supervision, and inspection unit (the photocopy is affixed with the unit's seal);

(6) Other materials required by law.

The fire-fighting agency of the public security organ shall complete the project inspection and make inspection records in accordance with the "Rules for Fire Protection Acceptance and Evaluation of Construction Projects" (GA836-2009) within 30 days from the date of receipt of the fire protection design filing materials. The inspection results will be announced in the fire protection record acceptance system. You can check in the "Announcement Information" of the "Fire Service Hall" (www.gx119.gov.cn) with the record number and verification code for the record. If the spot check is unqualified, the fire department of the public security organ shall, within five days according to law, issue a "Notice on Fire Protection Violation of the Completion Inspection and Acceptance of Construction Projects" and notify the construction unit in writing to make corrections. If it has already been used, it shall stop using it; after the construction unit receives the notification, it shall Stop use, and apply for re-examination to the fire protection agency of the public security organ after rectification; if the re-examination meets the requirements, the fire-fighting agency of the public security organ will issue a "Construction Project Completion Acceptance Fire Re-examination Opinion" to inform the construction unit to resume use. Those who fail to pass the random inspection according to law and do not stop using them will be punished by law according to law.

Except for large-scale crowded places and other special construction projects specified by the public security department of the State Council, construction projects that require fire protection design in accordance with national engineering construction fire protection technical standards shall be reported to the fire protection agency of the public security agency for filing in accordance with the law and accepted by the fire protection agency of the public security agency after completion and acceptance. Random checks, if not filed in accordance with the law, shall be punished by law in accordance with the law.

4. Charge basis and standard: No charge.

5. Use of public gathering places and fire safety inspection before business

(1) Inspection basis: "Fire Protection Law of the People's Republic of China"; "Fire Supervision and Inspection Regulations"

(2) Application materials:

1. Fire safety inspection declaration form;

2. A copy of the business license or the notice of pre-approval of the enterprise name issued by the administrative department for industry and commerce;

3. Copies of legal documents obtained in accordance with the law for fire control acceptance or filing of construction projects;

4. Fire safety system, fire extinguishing and emergency evacuation plans; if the public gathering place of the same building is shared with other units, a copy of the fire safety management agreement signed with other units should also be submitted;

5. The employee's pre-job fire safety education and training records and a photocopy of the fire-fighting industry-specific occupational qualification certificate obtained by the automatic fire-fighting system operator (the automatic fire-fighting system operator with a professional qualification certificate shall not be less than two);

6. Other materials that should be declared according to law. For public gathering places that have completed inspection and acceptance fire protection records in accordance with the law but have not undergone random inspections, they shall also submit the indoor decoration fire protection design and construction drawings of the premises, the quality certification documents of fire protection products, and the decoration and decoration materials with fire protection performance requirements. Documents and certificate of conformity with national standards or industry standards.

(3) Inspection time limit: The fire protection agency of the public security organ shall, within ten working days from the date of accepting the application, conduct a fire safety inspection on the site in accordance with the fire protection technical standards and management regulations.

(4) Charge basis and standard: no charge.

Tips:

1. Please keep in mind the record number and record verification code of the project you declare.

   2. You can check the fire protection design filing, completion acceptance fire filing, fire protection design review, fire inspection acceptance, public gathering place use, pre-opening fire protection in the "Announcement Information" of the "Fire Service Hall" (www.gx119.gov.cn) Security check 5 types of announcement information.


contact us

Contact: Mr. Cheng

phone:13712105616

Landline:0769-81126119

Guangdong Shunjie Fire-fighting Electrical Engineering Co., Ltd.

Scan WeChat to follow us

all rights reserved © Guangdong Shunjie Fire-fighting Electrical Engineering Co., Ltd. Sitemap XML Technical Support: 一箭天

返回顶部